Hebburn

PrimaryNPG66 kV5.75 kV

Upstream:GSPWest Boldon· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Network operator's rating, limited by fault level, not headroom

5 to 20MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro

Pro shows the exact figure, plus 45 nearby sites with more than 5 MW headroom. See Pro

Other figures

Sources retrieved 14 Nov 2026
Demand headroom
██.█MW
Hebburn 5.75 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
Hebburn 66 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
Hebburn 5.75 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

54.97750, -1.51920

Matched from heatmap
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register Part 2, retrieved 14 Nov 2026

Queued
0.0 MW
Connected
0.2 MW
Projects
1
See the 1 project behind this queue with Pro

66 kV

1 busbar

Hebburn 66 kV

NPGdistribution
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

5.75 kV

1 busbar

Hebburn 5.75 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG Heat Map Data - Table (fl_break_d / fl_break_r)
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Planned reinforcement

4 schemes, +15 MVA, first in service 2026DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of 1.3km of 66kV underground cablesCondition+0.0 MVA2026
Network rationalisationLoad+15.4 MVA2027
Replacement of 1.6km of 66kV overhead lineCondition+0.0 MVA2033
Replacement of 1.3km of 66kV underground cableCondition+0.0 MVA2033

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences