Harrogate

BSPNPG132 kV33 kV11 kV

Upstream:GSPKnaresborough· headroom can be limited upstream

At a glance

Generation headroom, free

Green

Over 20MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 15 Oct 2026
Demand headroom
██.█MW
HARROGATE 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
HARROGATE 132 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
HARROGATE 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

54.00109, -1.55404

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026

Queued
30 MW
Connected
1.8 MW
Projects
9
See the 9 projects behind this queue with Pro

132 kV

1 busbar

HARROGATE 132 kV

NPGdistribution
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

33 kV

1 busbar

HARROGATE 33 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

11 kV

2 busbars

Harrogate 132/11kV Direct

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG Heat Map Data - Table (fl_break_d / fl_break_r)
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

HARROGATE 11 kV

NPGdistribution
Generation headroom
██.█MW
NPG NDP generation headroom (DFES 2026 scenarios), retrieved 6 Sep 2026
Demand headroom
██.█MW
NPG NDP demand headroom (DFES 2026 scenarios), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG LTDS Appendix 5 Load Information, retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Planned reinforcement

2 schemes, first in service 2026DNO Network Development Reports
SchemeDriverUpliftIn service
Increase on both existing circuits of 20.1MVA for both circuit feeders.Asset replacement due to deteriorating condition and performance2026
Replacement of 8km of 132kV overhead lineCondition+0.0 MVA2026

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences