Harraton 11 kV
NPGdistributionNot published for this busbar: fault level.
Generation headroom, free
Red
No headroom
Source NPG NDP generation headroom (DFES 2026 scenarios), retrieved 6 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 27 Sep 2026Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Not published for this busbar: fault level.
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences