Guisborough

PrimaryNPG66 kV11 kV

Upstream:GSPLackenby· headroom can be limited upstream

At a glance

Generation Locked Sources retrieved 27 Sep 2026
Generation headroom
██.█MW
Guisborough 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
Guisborough 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
Guisborough 11 kV. NPG Heat Map Data - Table (fl_break_d / fl_break_r)
Firm capacity
██.█MVA
Guisborough 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

54.54252, -1.05684

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 27 Sep 2026

Queued
██.█MW
Connected
██.█MW
Projects
3
Unlock the full 3-project queue with a premium subscription

11 kV

1 busbar

Guisborough 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG Heat Map Data - Table (fl_break_d / fl_break_r)
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 66 kVGuisborough 66 kV NPGNo capacity or fault data published for this busbar
  • Voltage not statedGuisborough T1 T2 NPGNo capacity or fault data published for this busbar

Planned reinforcement

3 schemes, first in service 2026DNO Network Development Reports
SchemeDriverUpliftIn service
Increase on circuit feeder no1 (section to be replaced) of 27.6MVA.Asset replacement due to deteriorating condition and performance2026
Replacement of 0.9km of 66kV underground cablesCondition+0.0 MVA2026
Replacement of 66kV Transformer T1&T2Condition+0.0 MVA2033

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences