Grimsby West
BSPNPGNGET132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
19
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2028
First completion
1
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of the Grimsby Docks PSS with a dedicated 11kV customer metering substation and replacement of the 33/11kV T1 at Marsden Road. | Asset replacement due to deteriorating condition and performance | — | 2028 |
Voltage Levels (4)
132kV
2 busbarsGrimsby WestNGET
transmissionData Source
Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.