GRIMETHORPE 66/11KV 66 kV
NPGdistributionNot published for this busbar: generation headroom, demand headroom, firm capacity.
Upstream:GSPFerrybridge A· headroom can be limited upstream
Highest figure across the site's 5 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
NPG Embedded Capacity Register (>=1 MW), retrieved 27 Sep 2026
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences