Exeter

BSPNGEDNGET132 kV33 kV

Upstream:GSPExeter Main S.G.P.· headroom can be limited upstream

At a glance

Generation Locked Sources retrieved 7 Oct 2026
Generation headroom
██.█MW
Exeter Main BSP 33 kV. NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Demand headroom
██.█MW
Exeter Main BSP 33 kV. NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Fault level
██.█kA
Exeter Main BSP 132 kV. NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Firm capacity
██.█MVA
Exeter Main BSP 33 kV. NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

50.76702, -3.40398

From DNO data
Directions (Google Maps, new tab)

Connection queue

NGED connection queue, 45 per-GSP CSVs, one row per machine; NESO TEC Register (live, archive datastore dump), retrieved 7 Oct 2026

Queued
██.█MW
Connected
██.█MW
Projects
11
Unlock the full 11-project queue with a premium subscription

132 kV

1 busbar

Exeter Main BSP 132 kV

NGEDdistribution
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

33 kV

1 busbar

Exeter Main BSP 33 kV

NGED Generation Lockeddistribution
Generation headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Demand headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

Voltage not stated

2 busbars

Exeter Main Bsp

NGED Generation Lockeddistribution
Generation headroom
██.█MW
NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026
Demand headroom
██.█MW
NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026

Not published for this busbar: firm capacity, fault level.

Planned reinforcement

1 scheme, first in service 2027DNO Network Development Reports
SchemeDriverUpliftIn service
132kV fault level upgradesFault Level capability2027

Data source

Distribution operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence

Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence

Supported by NGED Open Data Supported by National Energy SO Open Data

Derived from publicly available DNO and TSO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the operators before making connection decisions. Attribution and licences