Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
4
Projects
Unlock the full 4-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
+1 MVA
Total uplift
2029
First completion
2
Schemes
SchemeDriverUpliftIn service
Replacement of 66/11kV transformer T1, 66kV circuit breaker and 11kV switchgearCondition+1.0 MVA2029
Replace the 66/11kV transformer T1, 66kV circuit breaker and 11kV switchgearAsset replacement due to deteriorating condition and performance2029

Capacity Forecast

Premium
Unlock multi-year capacity forecasts with premium

Voltage Levels (2)

66kV

1 busbar
ELSECAR 66 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

11kV

1 busbar
ELSECAR 11 kVNPGunknown
distribution
Gen Headroom

██.█MW

Demand Headroom

██.█MW

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid
License:OGL v3

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.