Drax
Upstream:GSPCamblesforth· headroom can be limited upstream
At a glance
Generation Locked Sources retrieved 7 Oct 2026- Generation headroom
- ██.█MW
- Drax. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2 and 1 more, retrieved 7 Oct 2026
- Projects
- 10
132 kV
1 busbar11 kV
1 busbarDRAX 11 kV
NPG Generation LockeddistributionOther voltage levels
- 66 kVDRAX 66 kV NPGNo capacity or fault data published for this busbar
- Voltage not statedDrax NGETNot openly published by NESO
Data source
Distribution operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence
Supported by Northern Powergrid Open Data Supported by National Energy SO Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO and TSO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the operators before making connection decisions. Attribution and licences