Daventry

BSPNGED132 kV33 kV11 kV

Upstream:GSPCoventry· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Network operator's rating, limited by thermal capacity, not headroom

Under 5MW

Source NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro

Pro shows the exact figure, plus 9 nearby sites with more than 5 MW headroom. See Pro

Other figures

Sources retrieved 27 Sep 2026
Demand headroom
██.█MW
Daventry 11 kV. NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Fault level
██.█kA
Daventry 132 kV. NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Firm capacity
██.█MVA
Daventry 11 kV. NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

52.25947, -1.15476

From DNO data
Directions (Google Maps, new tab)

Connection queue

NGED connection queue, 45 per-GSP CSVs, one row per machine, retrieved 27 Sep 2026

Queued
56 MW
Connected
0.0 MW
Projects
2
See the 2 projects behind this queue with Pro

132 kV

1 busbar

Daventry 132 kV

NGEDdistribution
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA

33 kV

1 busbar

Daventry 33 kV

NGEDdistribution
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

11 kV

1 busbar

Daventry 11 kV

NGED Generation Lockeddistribution
Generation headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Demand headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

Data source

Network operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence

Supported by NGED Open Data