Chesterfield

BSPNGEDNGET132 kV 33 kV

Location

Loading map...
Coordinates

53.224250, -1.387360

From DNO data
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

N/A

Operators

NGED, NGET

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
37
Projects
Unlock the full 37-project queue with a premium subscription

Voltage Levels (3)

132kV

2 busbars
Chesterfield 132 kVNGED
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

ChesterfieldNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

min: 21.2 kA

Firm Capacity

N/A

33kV

1 busbar
Chesterfield 33 kVNGED
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Distribution Operator:National Grid Electricity Distribution
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.