Burwell Local
PrimaryUKPN33 kV11 kV
At a glance
Sources retrieved 2 Oct 2026- Generation headroom
- ██.█MW
- BURWELL LOCAL GRID 132/33kV. UKPN DFES Network Headroom Report (three category rows per site), retrieved 27 Sep 2026
Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
UKPN Embedded Capacity Register 2 (>=1 MW); UKPN Embedded Capacity Register 1 (<1 MW), retrieved 2 Oct 2026
- Projects
- 19
33 kV
1 busbar11 kV
1 busbarBURWELL PRIMARY 33/11kV
UKPNdistribution Source (opens the operator's dataset in a new tab)Planned reinforcement
1 scheme, first in service 2026DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| 1 x 33kV CB, 2 x grid transformers uprated | Load related reinforcement | 2026 |
Data source
Network operator: UK Power Networks. Licence: CC BY 4.0
Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences