Bramford
BSPUKPNNGET132 kV
Site Summary
Voltage Levels
2
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NGET, UKPN
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
42
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2026
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| 2 x 3km 33kV cable (Bury-British Sugar), 3 x 33kV CBs (Bury Grid, British Sugar) | Load related reinforcement | — | 2026 |
| Additional EHV switchgear (including completion of GTs and 33kV interconnections) | Load related reinforcement | — | 2026 |
Voltage Levels (2)
Data Source
Distribution Operator:UK Power Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.