Bramford

BSPUKPNNGET132 kV

Location

Loading map...
Coordinates

52.070182, 1.062823

From DNO data
Get Directions

Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

N/A

Best Demand Headroom

N/A

Operators

NGET, UKPN

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
42
Projects
Unlock the full 42-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2026
First completion
2
Schemes
SchemeDriverUpliftIn service
2 x 3km 33kV cable (Bury-British Sugar), 3 x 33kV CBs (Bury Grid, British Sugar)Load related reinforcement2026
Additional EHV switchgear (including completion of GTs and 33kV interconnections)Load related reinforcement2026

Voltage Levels (2)

132kV

2 busbars
BramfordNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

min: 28.7 kA

Firm Capacity

N/A

BRAMFORD GRID 132kVUKPN
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Distribution Operator:UK Power Networks
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.