Billy Mill

PrimaryNPG33 kV 11 kV
Grid capacity by postcode district: NE25NE27NE29NE30

Location

Loading map...
Coordinates

55.015514, -1.474866

From DNO data
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Network Hierarchy

CurrentBilly Mill

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
3
Projects
Unlock the full 3-project queue with a premium subscription

Voltage Levels (3)

33kV

1 busbar
Billy Mill 33kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

11kV

1 busbar
Billy MillNPGunknown
distribution
Gen Headroom

██.█MW

NPG Heatmap Data

Demand Headroom

██.█MW

NPG Heatmap Data

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

Voltage unspecified

1 busbar
Billy MillNPG
distribution
Gen Headroom

N/A

Demand Headroom

██.█MW

native:npg-site-utilisation

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid

Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.