Axminster

GSPNGED132 kV

At a glance

Generation headroom, free

Green

Over 20MW

Source NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 14 Oct 2026
Demand headroom
██.█MW
Woodcote Bsp. NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026
Fault level
██.█kA
Axminster 132 kV. NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Firm capacity
Not published

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

50.78764, -2.92112

From DNO data
Directions (Google Maps, new tab)

Connection queue

SSEN ECR Part 1, 1 MW and 50 kW registers (files), retrieved 14 Oct 2026

Queued
120 MW
Connected
0.5 MW
Projects
5
See the 5 projects behind this queue with Pro

132 kV

2 busbars

Axminster 132 kV

NGEDdistribution
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

AXMINSTER 132 kV

SSEN Generation Lockeddistribution
Fault level (3-phase)
██.█kA
SSEN Headroom Dashboard Data, March 2026

Not published for this busbar: generation headroom, demand headroom, firm capacity.

GSP export limitGSP group
██.█MW
Winter. SSEN GSP Technical Limits (CSV), retrieved 27 Sep 2026
GSP import limitGSP group
██.█MW
Solar Min. SSEN GSP Technical Limits (CSV), retrieved 27 Sep 2026
Fault and rating detail
Fault level (1-phase)
██.█kA
Break rating
██.█kA

Voltage not stated

1 busbar

Woodcote Bsp

NGED Generation Lockeddistribution
Generation headroom
██.█MW
NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026
Demand headroom
██.█MW
NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026

Not published for this busbar: firm capacity, fault level.

Planned reinforcement

2 schemes, first in service 2036DNO Network Development Reports
SchemeDriverUpliftIn service
Demand reinforcement at Axminster (NSHR expected in-service date 2036)Capacity2036
Generation reinforcement at Axminster (NSHR expected in-service date 2036)Capacity2036

Data source

Network operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence

Supported by NGED Open Data

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences