Audby Lane
Upstream:BSPBramhamGSPFerrybridge B· headroom can be limited upstream
At a glance
Generation Locked Sources retrieved 27 Sep 2026- Generation headroom
- ██.█MW
- AUDBY LANE 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Highest figure across the site's 5 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register Part 2, retrieved 27 Sep 2026
- Projects
- 9
11 kV
1 busbarVoltage not stated
2 busbarsAUDBY LANE INDUSTRIAL 48962
NPGdistribution Source (opens the operator's dataset in a new tab)Not published for this busbar: generation headroom, fault level.
Audby Lane
NPGdistribution Source (opens the operator's dataset in a new tab)No capacity or fault data published for this busbar
Other voltage levels
- 33 kVAUDBY LANE 33 kV NPGNo capacity or fault data published for this busbar
- 6 kVAUDBY LANE 6 kV NPGNo capacity or fault data published for this busbar
Planned reinforcement
2 schemes, first in service 2027DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 33kV Cable (3.0km cable overlay) | Condition | +0.0 MVA | 2027 |
| Replacement of 33kV T1 transformer | Condition | +0.0 MVA | 2033 |
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences