Acer Avenue

PrimarySPEN33 kV11 kV

At a glance

Generation headroom, free

Red

No headroom

Source SPM Network Scenario Headroom Report (primary groups), retrieved 27 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro

Pro shows the exact figure, plus 16 nearby sites with more than 5 MW headroom. See Pro

Other figures

Sources retrieved 27 Sep 2026
Demand headroom
██.█MW
ACER AVE 11kV. SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026
Fault level
██.█kA
Acer Ave 33kV. SPM LTDS Appendix 4 Fault Levels (Table 4) 33kV 3ph
Firm capacity
██.█MVA
ACER AVE 11kV. SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

53.11060, -2.43380

Matched from heatmap
Directions (Google Maps, new tab)

33 kV

1 busbar

Acer Ave 33kV

SPENdistribution Source (opens the operator's dataset in a new tab)
Fault level (3-phase)
██.█kA
SPM LTDS Appendix 4 Fault Levels (Table 4) 33kV 3ph

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

11 kV

1 busbar

ACER AVE 11kV

SPENdistribution
Generation headroom
██.█MW
SPM Network Scenario Headroom Report (primary groups), retrieved 27 Sep 2026
Demand headroom
██.█MW
SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026
Firm capacity
██.█MVA
SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026

Not published for this busbar: fault level.

Planned reinforcement

1 schemeDNO Network Development Reports
SchemeDriverUpliftIn service
Install a new 10MVA 33/11kV transformer at Acer Avenue primary ​ substation, replace the 33kV &11kV switchgear, and reconfigure the 33kV circuit and underlying 11kV network. Contract flexibility services to support the network during the project delivery and manage the constraint in the interim.Thermal

Data source

Network operator: SP Energy Networks. Licence: CC BY 4.0

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences