Grid capacity in Tayside and Central

Grid capacity overview for Tayside and Central: 11,877 substations, 0.0 MW of generation in the connection queue, operated primarily by SSEN.

11,877
Sites
12,717
Busbars
0.0 MW
Queued
0.0 MW
Connected
—
% Connected

Top sites by queued generation

#SiteDNOQueuedConnectedProjects
1Sepd P2 Braco33 kV SSEN0.0 MW—0
2Shepd 0014 Dundee33 kV SSEN0.0 MW—0
3Shepd 0062 Arbroath33 kV SSEN0.0 MW—0
4Shepd 0208 Crieff33 kV SSEN0.0 MW—0
5Shepd 0276 Fincastle Pitlochry33 kV SSEN0.0 MW—0
6Shepd 032 Dundee33 kV SSEN0.0 MW—0
7Shepd 034 Perth33 kV SSEN0.0 MW—0
8Shepd 057 Kepculloch Perth11 kV SSEN0.0 MW—0
9Shepd 062 Arbroath11 kV SSEN0.0 MW—0
10Shepd 064 Carnoustie33 kV SSEN0.0 MW—0

About Tayside and Central

Tayside and Central is served primarily by SSEN. We track 11,877 grid substations and 12,717 individual busbars in this area, with 0.0 MW of generation currently in the connection queue and 0.0 MW already connected. Data is sourced from each DNO's published Embedded Capacity Register and the NESO Transmission Entry Capacity register, refreshed on each DNO publication.

Other areas served by SSEN