Grid capacity in Tayside and Central
Grid capacity overview for Tayside and Central: 11,877 substations, 0.0 MW of generation in the connection queue, operated primarily by SSEN.
11,877
Sites
12,717
Busbars
0.0 MW
Queued
0.0 MW
Connected
—
% Connected
Top sites by queued generation
| # | Site | DNO | Queued | Connected | Projects |
|---|---|---|---|---|---|
| 1 | Sepd P2 Braco33 kV | SSEN | 0.0 MW | — | 0 |
| 2 | Shepd 0014 Dundee33 kV | SSEN | 0.0 MW | — | 0 |
| 3 | Shepd 0062 Arbroath33 kV | SSEN | 0.0 MW | — | 0 |
| 4 | Shepd 0208 Crieff33 kV | SSEN | 0.0 MW | — | 0 |
| 5 | Shepd 0276 Fincastle Pitlochry33 kV | SSEN | 0.0 MW | — | 0 |
| 6 | Shepd 032 Dundee33 kV | SSEN | 0.0 MW | — | 0 |
| 7 | Shepd 034 Perth33 kV | SSEN | 0.0 MW | — | 0 |
| 8 | Shepd 057 Kepculloch Perth11 kV | SSEN | 0.0 MW | — | 0 |
| 9 | Shepd 062 Arbroath11 kV | SSEN | 0.0 MW | — | 0 |
| 10 | Shepd 064 Carnoustie33 kV | SSEN | 0.0 MW | — | 0 |
About Tayside and Central
Tayside and Central is served primarily by SSEN. We track 11,877 grid substations and 12,717 individual busbars in this area, with 0.0 MW of generation currently in the connection queue and 0.0 MW already connected. Data is sourced from each DNO's published Embedded Capacity Register and the NESO Transmission Entry Capacity register, refreshed on each DNO publication.