Grid capacity in Shetland District

Grid capacity overview for Shetland District: 1,906 substations, 0.0 MW of generation in the connection queue, operated primarily by SSEN.

1,906
Sites
2,026
Busbars
0.0 MW
Queued
0.0 MW
Connected
—
% Connected

Top sites by queued generation

#SiteDNOQueuedConnectedProjects
1Shepd 0790 Bixter Shetland33 kV SSEN0.0 MW—0
2Shepd 679 Voe Shetland33 kV SSEN0.0 MW—0
3Shepd 692 Firth Shetland11 kV SSEN0.0 MW—0
4Shepd 9201854 Unst Shetland11 kV SSEN0.0 MW—0
5Shepd 9303288 Bixter Shetland11 kV SSEN0.0 MW—0
6Shepd 9303336 Sumburgh Shetland11 kV SSEN0.0 MW—0
7Shepd 9303361 Lerwick Shetland11 kV SSEN0.0 MW—0
8Shepd 9303379 Scalloway Shetland11 kV SSEN0.0 MW—0
9Shepd 9303399 Lerwick Shetland11 kV SSEN0.0 MW—0
10Shepd 9303489 Bixter Shetland33 kV SSEN0.0 MW—0

About Shetland District

Shetland District is served primarily by SSEN. We track 1,906 grid substations and 2,026 individual busbars in this area, with 0.0 MW of generation currently in the connection queue and 0.0 MW already connected. Data is sourced from each DNO's published Embedded Capacity Register and the NESO Transmission Entry Capacity register, refreshed on each DNO publication.