THE CROSS 33/11kV
Network Hierarchy
CurrentTHE CROSS 33/11kV
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Operational restriction: FL exceeded if run solid, Bar normally Split 2-way due to GSP Parallel
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.