MARCH GRID 132/33kV

GridUKPN33 kV

Location

Loading map...
Coordinates

52.548257, 0.074895

From DNO data
Get Directions

Network Hierarchy

CurrentMARCH GRID 132/33kV
BSPEastern Power Networks (EPN)

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating

██.█kA

Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Fault level >95% of rating: UKPN to investigate short-term mitigation/intervention.
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:UK Power Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.