MAIDSTONE GRID SOUTH
GridUKPN11 kV
Network Hierarchy
CurrentMAIDSTONE GRID SOUTH
BSPSouth Eastern Power Networks (SPN)
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Operational restriction: HV Interconnection open between [Maidstone Grid South 11kV] - [Maidstone Grid North 11kV]
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.