HARLOW WEST GRID 33/11kV
Network Hierarchy
CurrentHARLOW WEST GRID 33/11kV
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Site classified HOT (high earth potential rise)
- Operational restriction: HV Interconnection open between the 2x 11kV local primaries.
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.