CROUCH END PRIMARY 33/6.6kV
PrimaryUKPN6.6 kV
Network Hierarchy
CurrentCROUCH END PRIMARY 33/6.6kV
BSPEastern Power Networks (EPN)
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Fault level >95% of rating: Network running arrangement assessment being caried out to reduce fault level in standard running
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.