YATTON KEYNELL 11 kV

PrimarySSEN11 kV SN14

Location

Loading map...
Coordinates

51.480849, -2.184273

From DNO data
Get Directions

Network Hierarchy

CurrentYATTON KEYNELL 11 kV

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Subject to Mod App outcome Reinforce the 33kV circuit between Chippenham BSP and Yatton Keynell (Mar 2027) Replace the 33kV switchgear at Chippenham BSP (Aug 2027) Reinforce the 132kV circuits between Melksham GSP and Chippenham (Aug 2027) Add a 3rd 90MVA BSP transformer at Chippenham (Oct 2027) Add a new 33kV circuit between Yatton Keynell and Alterton (Jun 2028)
  • Distribution constrained
  • Replace the existing transformers with 7.5MVA units
  • Constrained due to upstream thermal limitations on Chippenham BSP TX under N-1
  • Upstream queue: 515.5MW
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.