THE MALL 11 kV

PrimarySSEN11 kV

Location

Loading map...
Coordinates

51.454136, -0.974976

From DNO data
Get Directions

Network Hierarchy

CurrentTHE MALL 11 kV
BSPREADING TOWN
GSPFLEET BRAMLEY

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • LimIted by 33 kV feeder spr/aut rating Fleet & Bramley GSP group to be split and a new 132kV switchboard installed at Bramley (Jul 2030)
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.