Sepd P6 Poole
SecondarySSEN11 kV
Site Summary
Voltage Levels
1
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
SSEN
Network Hierarchy
CurrentSepd P6 Poole
BSPPoole
GSPMannington
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Voltage Levels (1)
11kV
1 busbarSEPD P6 POOLESSEN
distribution Gen Headroom
N/A
Demand Headroom
N/A
Fault Level (3ph)
N/A
Firm Capacity
N/A
Data Source
Primary DNO:Scottish and Southern Electricity Networks
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.