ROSE HILL 11 kV
PrimarySSEN11 kV
Network Hierarchy
CurrentROSE HILL 11 kV
BSPCowley Local (2 x 90)
GSPCOWLEY
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- Works towards a new 33/11kV Primary in the vicinity Add a 3rd 132kV circuit between Cowley GSP and Cowley Local BSP alongside a 3rd 90MVA BSP transformer (March 2031) Reinforce the 33kV circuits between Cowley Local BSP and Rose Hill primary (Oct 2028)
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
DNO:Scottish and Southern Electricity Networks
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.