Poole Primary
Network Hierarchy
CurrentPoole Primary
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Gen: Upstream Thermal Capacity & Substation Fault Level & Upstream Fault Level Constraint
- Replace the 11kV board with 25kA break / 62.5kA make switchgear
- Upstream queue: 95.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.