GORDON ROAD 11 kV

PrimarySSEN11 kV SO23

Location

Loading map...
Coordinates

51.067234, -1.313249

From DNO data
Get Directions

Network Hierarchy

CurrentGORDON ROAD 11 kV

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Replace the existing 33kV switchboard at Winchester BSP (Mar 2029) Reinforce the 132kV circuits between Nursling GSP and Winchester BSP, replace the 132kV switchboard and install a 3rd 90MVA BSP transformer (May 2029)
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.