FROME 33 kV
BSPSSEN33 kV
Network Hierarchy
CurrentFROME 33 kV
GSPMelksham GSP
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Gen: Upstream Thermal Capacity
- Replace the 33kV board with 31.5kA break / 78.8kA make switchgear (Sep-27) Add a 3rd 90MVA transformer
- Upstream queue: 515.5MW
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
DNO:Scottish and Southern Electricity Networks
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.