FELTHAM 6.6 kV
PrimarySSEN6.6 kV
Network Hierarchy
CurrentFELTHAM 6.6 kV
BSPEAST BEDFONT A
GSPLALEHAM
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- Modification Application in progress to increase the capacity at LALEHAM GSP. Replace both existing transformers at East Bedfont A with 90MVA units (July 2030)
- Limited headroom at BSP
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
DNO:Scottish and Southern Electricity Networks
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.