FARINGDON 11 kV

PrimarySSEN11 kV SN7

Location

Loading map...
Coordinates

51.652374, -1.584835

From DNO data
Get Directions

Network Hierarchy

CurrentFARINGDON 11 kV

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Install a new 33kV circuit between Stratton BSP and Farringdon (May 2027) Replace the 33kV switchboard and establish an auto-close scheme to run Stratton solid under N-1 of losing a 132/33kV transformer (Mar 2028)
  • thermal constraint on Minety - Galileo 132kV cct
  • Upstream queue: 380.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.