CROOKHAM
PrimarySSEN11 kV
Network Hierarchy
CurrentCROOKHAM
BSPCOXMOOR WOOD
GSPFLEET BRAMLEY
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- Reinforce the 33kV circuits between Coxmoor Wood BSP and Crookham (Dec 2024) Fleet & Bramley GSP group to be split and a new 132kV switchboard installed at Bramley (Jul 2030) Add a 3rd 90MVA BSP transformer at Coxmor Wood (Dec 2031)
- Limited headroom at BSP
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.