COTTISFORD 11 kV

PrimarySSEN11 kV NN13

Location

Loading map...
Coordinates

51.975494, -1.142165

From DNO data
Get Directions

Network Hierarchy

CurrentCOTTISFORD 11 kV

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Reinforce the Bichester to Upper Heyford 33kV circuits (Jun 2025) Existing 132/33kV transformers to be upgraded from 90MVA units to 120MVA (Aug 2027) Install a new 132kV circuit between East Claydon GSP and Bichester North alongside a 3rd 120MVA BSP transformer, replace the single 33kV busbar with a GIS double busbar (TBC - dependant on Mod App outcome)
  • Constrained due to upstream thermal limitations.
  • Upstream queue: 2550.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.