COCKLEBURY 11 kV

PrimarySSEN11 kV SN15

Location

Loading map...
Coordinates

51.463930, -2.110115

From DNO data
Get Directions

Network Hierarchy

CurrentCOCKLEBURY 11 kV

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Subject to Mod App outcome Replace the 33kV switchgear at Chippenham BSP (Aug 2027) Reinforce the 132kV circuits between Melksham GSP and Chippenham (Aug 2027) Add a 3rd 90MVA BSP transformer at Chippenham (Oct 2027)
  • Constrained due to upstream thermal limitations on Chippenham BSP TX under N-1
  • Upstream queue: 515.5MW
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.