CHILTON CANTELO

PrimarySSEN11 kV BA22

Location

Loading map...
Coordinates

50.992393, -2.601093

From DNO data
Get Directions

Network Hierarchy

CurrentCHILTON CANTELO

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Replace Axminster to Yeovil oil filled cable circuit 2 (Jun 2028) Install a new 3132kV circuit between Axminster GSP and Yeovil BSP and replace both 60MVA transformers with 90MVA units (Feb 2031)
  • Distribution constrained
  • Moderate proximity to upstream 33kV circts restrictions.There is no reverse power capacity at the Yeovil BSP,33kV circuit thermal limitation.
  • Upstream queue: 120.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.