CENTRAL BRIDGE 11 kV

PrimarySSEN11 kV

Location

Loading map...
Coordinates

50.899208, -1.395725

From DNO data
Get Directions

Network Hierarchy

CurrentCENTRAL BRIDGE 11 kV
BSPSouthampton (2 x 60)
GSPNURSLING

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Reinforce the existing 33kV circuits between Southampton BSP and Central Bridge with 3 x 33kV circuits (Jun 2028) Replace the existing Southampton Main / Reserve arrangement with a new BSP. This will require 2 new 132kV circuits to be run from Nursling GSP to the new BSP, replacement of the existing BSP transformers with 3 x 90MVA units and a new 33kV switchboard (Mar 2030)
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3