BRADFORD-ON-AVON 11 kV
PrimarySSEN11 kV
Network Hierarchy
CurrentBRADFORD-ON-AVON 11 kV
BSPNORRINGTON
GSPMELKSHAM
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- Subject to Mod App outcome Add a 4th 132kV circuit between Melksham GSP and Norrington (Oct 2027) Replace the 33kV switchgear and add a 4th 90MVA BSP transformer at Norrington (Oct 2027) Add a 5th 90MVA BSP transformer and divide the existing Norrington BSP into 'Norrington A' including 3 x 90MVA transformers and 'Norrington B' including 2 x 90MVA transformers (Oct 2029)
- No fault level headroom at Norrington 33kV for new gen connections
- Upstream queue: 515.5MW
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.