Boston Manor Primary
PrimarySSEN11 kV
Network Hierarchy
CurrentBoston Manor Primary
GSPEaling GSP
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Gen: Substation Fault Level & Upstream Fault Level Constraint
- Demand: Substation Thermal Capacity
- Replace the existing transformers with 30 / 60MVA units
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source