BOSCOMBE DOWN 11 kV
PrimarySSEN11 kV
Network Hierarchy
CurrentBOSCOMBE DOWN 11 kV
BSPAMESBURY
GSPBRAMLEY (ANDO-THAT)
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- 33 kV feeder summer limit Bank the existing 2 x 45MVA transformers and install a new 90MVA transformer
- Upstream queue: 537.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.