Network Hierarchy
CurrentBICESTER 11 kV
GSPEAST CLAYDON
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- Reinforce the Bichester to Upper Heyford 33kV circuits (Jun 2025) Existing 132/33kV transformers to be upgraded from 90MVA units to 120MVA (Aug 2027) Install a new 132kV circuit between East Claydon GSP and Bichester North alongside a 3rd 120MVA BSP transformer, replace the single 33kV busbar with a GIS double busbar (TBC - dependant on Mod App outcome)
- Constrained due to upstream thermal limitations.
- Upstream queue: 2550.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
DNO:Scottish and Southern Electricity Networks
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.