ARBORFIELD 11 kV

PrimarySSEN11 kV

Location

Loading map...
Coordinates

51.385867, -0.909964

From DNO data
Get Directions

Network Hierarchy

CurrentARBORFIELD 11 kV
BSPBASINGSTOKE T1B & T2B
GSPBRAMLEY (BASI)

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Headroom

██.█MW

Demand Headroom

██.█MW

Fault Levels

3-Phase Fault

██.█kA

1-Phase Fault

██.█kA

Ratings

Make Rating
Not in DNO data
Break Rating

██.█kA

Firm Capacity

██.█MVA

Network Constraints

Constraint Details
  • Upstream constrained
  • Upgrade the circuits between Reading BSP, Little Hungerford and Arborfield to increase capacity and reconfigure the auto-changeover arrangement (Dec 2024)
  • Connections might not possible prior to Bramley Green-Arborfield reconfiguration. Reinforcement required at Arborfield and the 33kV circuits from Little Hungerford to accommodate additional connections. Voltage Issues.
  • Upstream queue: 537.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP

High queue indicates significant generation already contracted at this connection point.

Data Source

DNO:Scottish and Southern Electricity Networks
License:OGL v3

Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.