Skelton Grange
GSPNPG132 kV
Network Hierarchy
CurrentSkelton Grange
BSPundefined
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream gen: NGET
- Upstream demand: NGET
- Voltage (gen): Data Not Available
- Voltage (demand): Data Not Available
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Supply Point (8)
| Name | Voltage | Status |
|---|---|---|
| HECKMONDWIKE 11 33 kV | 33 kV | - |
| LEEDS EAST 33 kV | 33 kV | - |
| LEEDS NORTH 33 kV | 33 kV | - |
| LOW ROAD 132/33KV 999 33 kV | 33 kV | - |
| RODLEY 33 kV | 33 kV | - |
| STAYGATE 33 kV | 33 kV | - |
| Saint Andrews Road 132/33kV | 33 kV | - |
| WAKEFIELD NORTH 33 kV | 33 kV | - |
Primary (45)
Nearby Substations
Data Source
DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.