HOLLINGS FARM 595
NPG
Network Hierarchy
CurrentHOLLINGS FARM 595
BSPKEIGHLEY
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.