Denwick 20 kV
PrimaryNPG20 kV
Network Hierarchy
CurrentDenwick 20 kV
BSPundefined
GSPBlyth 132kV
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Generation: Red - Voltage
- AMBERFault Level
- Demand: Amber - Fault Level
- Upstream gen: Upstream Constraint
- Upstream demand: Upstream Constraint
- Voltage (gen): Voltage Constraint
- Voltage (demand): No Voltage Constraint
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.