BRADFIELD EXCHANGE 2092
PrimaryNPG11 kV
Network Hierarchy
CurrentBRADFIELD EXCHANGE 2092
BSPSHEFFIELD
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.