BSP 303024
Network Hierarchy
Ratings
Make Rating
Not in DNO data
Break Rating
Not in DNO data
Network Constraints
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
PRY (4)
| Name | Voltage | Status |
|---|---|---|
| BOLLINGTON | 11 kV | - |
| S.E. MACCLESFIELD | 11 kV | - |
| S.W. MACCLESFIELD | 11 kV | - |
| WITHYFOLD DRIVE | 11 kV | - |
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.