West Wylam
UnknownNPG
Site Summary
Voltage Levels
1
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NPG
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
5
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2026
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replace 20kV switchgear in a new switchroom | Asset replacement due to deteriorating condition and performance | — | 2026 |
| Replacement of 20kV switchgear in a new switchroom | Condition | +0.0 MVA | 2027 |
Voltage Levels (1)
Data Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.