Urlay Nook
UnknownNPG
Site Summary
Voltage Levels
2
Best Gen RAG
unknown
Best Gen Headroom
N/A
Best Demand Headroom
N/A
Operators
NPG
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
3
Projects
Planned Reinforcement
DNO Network Development Reports+23 MVA
Total uplift
2026
First completion
4
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 6.2km of 33kV underground cables | Condition | +0.0 MVA | 2026 |
| Replacement of 11kV switchgear in new switchboard room with an Automated Power Restoration System (APRS) in place | Load | +22.8 MVA | 2033 |
| Replacement of 3.1km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
| Replacement of 3km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
Voltage Levels (2)
Data Source
Primary DNO:Northern Powergrid
License:OGL v3
Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.